Can sod go straight over an old lawn or onto bare dirt?

Not onto an old lawn, and not onto unprepared dirt. The guidelines Ontario landscapers work to call for existing vegetation to be removed, compacted soil loosened, the grade corrected and topsoil raked smooth before sod is laid. Bare ground left by a builder still needs that loosening and a layer of topsoil. Our residential page walks through the preparation.

Is spring or fall better for laying sod in Toronto?

Either works, and so does summer if the watering is kept up. The rule in the landscape standards is about conditions, not months: sod is laid in the growing season, never over frozen soil, and not into a dry spell without water. The City treats November to April as the dormant period for its own sod contracts. Say when you would like the work done on the estimate form.

How do I measure my yard?

Sketch it, split it into rectangles, and multiply length by width in feet for each one. Add the rectangles together and leave out whatever will not be sodded: beds, a patio, a shed. Ontario's sod growers suggest rounding up. A rough figure is enough for an estimate, and the cost guide shows how the total area changes the rate.

Stage 2

Installation day

How long does a sod installation take?

Most standard residential installations are completed in one day once site preparation is done. Larger properties, building sites that need heavy preparation and commercial areas take longer. The day is planned around the delivery, because sod is laid soon after it arrives. Your written estimate will say what applies to your yard. If your timing is tight, call (647) 243-4764 before you book anything else around it.

Why does the sod arrive on the day and not before?

Because it is alive and does not keep. The Canadian Landscape Standard calls for sod to be installed within 24 hours of delivery and within 36 hours of harvest, and to be kept moist and cool if there is any delay. Sod that has visibly deteriorated can be rejected under the same standard. That is why the ground is finished first and the delivery is timed to it.

Stage 3

After the sod is down

How long does new sod take to root?

Plan on weeks, not days. No Ontario authority publishes a single figure. The City of Toronto's own sod contracts expect sod to be green and rooted into the soil 60 days after it is laid, which is a fair outer benchmark for a yard. Until the roots have taken, keep heavy foot traffic off it. The care sheet left on the day covers the first weeks.

When can I mow new sod?

When the grass has grown, not on a fixed date. Ontario's sod growers say a new lawn typically needs its first cut after six or seven days; the landscape guideline says to mow once it reaches 40 to 50 mm. Either way, never take off more than a third of the blade, and wait until the ground is firm underfoot. Your written care instructions repeat this for the first month.

How much should I water new sod?

Soak it straight away, then keep the soil under it moist every day until it roots. The target in Ontario's landscape guideline is moisture 75 to 100 mm down, which you can check by lifting a corner. Toronto has no fixed watering days, but water must not run off into the street. Once rooted, a lawn needs about 2.5 cm a week, rain included.

Sprinkler head spraying water beside a small tree
Two landscapers mowing and edging a lawn beside a row of evergreens
Hand holding a clump of dark, moist soil

Question not answered here?

Free written estimate. We reply the same business day, Mon to Sat, 7:00 a.m. to 7:00 p.m..

© 2026 Toronto Sod Installation · Privacy · Terms of use · Accessibility · Service disclosure
CallRequest a Free Estimate